















Your Custom Text Here
concrete slab for doublewide.jpg
A Monolithic Concrete slab for a Manufactured multi-section home. A slab will require perimeter frost protection
pier footers doublewide.jpg
A site is prepared with 40" deep pier footers.
hud spot on plastic.jpg
A section of a manufactured home is spotted on a site. Concrete pier footers are under a required 6 mil vapor barrier.
hud pier and anchor strap.jpg
A typical block pier and tie down strap.
hud pier plastic sewer line copy.jpg
A sewer line that is strapped in place with the proper pitch, a block pier, and 6 mil vapor barrier.
Minuteman LLBS Tiedown System
hud with vinyl skirting.jpg
A Multi-section manufactured home that was pier set and the perimeter enclosed with vented vinyl skirting.
Perimeter Footers with Frost wall
Perimeter Footers with individual pier footers and Frost walls.
Crawlspace footers backfilled with stone
Masonry crawlspace perimeter footers backfilled with stone and gable end ramped for home delivery.
Crawlspace Footers with Ribbon Footers
Perimeter crawlspace footers with Ribbon footers for the Frame Piers.
Crawlspace Footers backfilled with stone
Crawlspace Footers with Ribbon footers for Frame piers backfilled with stone
Crawlspace Site prep
Ramp for Manufactured home being set on Masonry crawlspace.
Manufactured Home delivered and set on footers.
Manufactured home is spotted and set on concrete footers.
Masonry Crawlspace
Masonry Crawlspace built after home is set.
Final Grading
Masonry crawlspace is backfilled and graded. Allows you to back fill the foundation to within 14” of the exterior door sills and minimizing the number of steps.